By 1999, the dam, canal and power house were finally finished and passed inspection. Tall wooden posts on which wires would bring electricity to the houses were put up. SIBAT, led by engineer Pol Tabiolo, then arrived with a turbine, dynamo and wires. They installed the machinery that was designed for 7.5 kilowatts, enough to provide the basic and initial electricity needs of Katablangan.
Read moreCategory: OUR WORK
SIBAT CBRES Meeting
SIBAT-CBRES engineering team with Engr. Frank Taguba conducting an assesment of the feasibility survey for Micro-Hydro Power project in Kabugao, Apayao.
Read moreFeasibility survey for MHP project in Kabugao, Apayao
SIBAT Inc. engineers together with the local community conducted a feasibility study for a possible Micro-Hydro Power as a source of electricity for 3 barangays in the municipality of Kabugao, Apayao. Sitio Apadi, Brgy. Dibagat; Sitio Nacagman, Brgy. Madatag and Brgy. Madduang.
Read moreWith Global Giving representative Ms. Gordo
Ms. Cathy Gordo of Global Giving visited Mangarita Organic Farm in Tarlac.
Read moreCourtesy call to Kalinga Governor Edubba
SIBAT Inc. Executive Director Estrella Catarata and her staff courtesy call visit Governor James Edubba at his office in Kalinga Provincial Capitol. Both parties discussed and agreed on continuing the development of the Community Based Renewable Energy Systems (CBRES) projects in the off-grid communities in Kalinga.
Read moreCSO conference in Kalinga
CSO conference for accreditation at Kalinga Provincial Capitol.
Read moreWith JICA consultants
Japan International Cooperation Agency (JICA) consultants in a meeting with SIBAT Executive Director Estrella Catarata for further cooperation.
Read moreELC test rig with Engr. Dann Frydman
ELC test rig at SIBAT CREATech with Engr Dann Frydman together with our engineers, technicians and staff.
Read moreELC Technology Training with Engr. Dann Frydman
Training technical staff to further enhance and develop the Electronic Load Controller (ELC) Technology with Engineer Dann Frydman.
Read moreEndemic Tree-planing in Brgy. Bayabas, Malibcong, Abra
In partnership with Global Giving Fund, SIBAT together with the local community of Bayabas Abra continue to plant endemic trees . The goal of the project is to plant 1000 local tree species to rehabilitate and preserve their deteriorating watershed area.
Read more